A detailed description of the consumer journey of installing solar panels in California.

OC Green Mama

The day was finally here we had been waiting for – installation day.

Our solar panel system is fairly large (7.2kw) so installation actually took two days.

Installation was a breeze. The hardest thing was keeping my dogs from freaking out while a crew of people stomped across our roof.

Now that it’s all done, our home looks like this:

SolarCollage

If we were overly concerned about hiding our system, we could have limited it to the panels on the side of our house that are virtually undetectable. I had a hard time even photographing them – in the photo to the left above. Because of the elevation of our house, you can barely see them from the street.

Our main concern was generating as much solar power as our roof and the orientation of our house would allow, so we decided to maximize our roof space by using the area…

View original post 480 more words

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s